Installations
Branham High School (Campbell UHSD)
The scope includes the supply and installation of four DSA Pre-Approved, two story buildings consisting of one, 8 classroom building and one, 12 Classroom building along with two DSA Pre-Approved two story STEM building consisting of a Full STEM Labs building and a Left STEM Labs building connected by four DSA Pre-Approved pedestrian bridges. The project was completed in three phases to allow for rapid site mobilization.